Care and storage should be planned by furniture zone, component and event. The useful plan tells staff what to inspect, which supplier instruction applies, where removable parts go, who acts after rain or before severe weather, and how damage or replacement needs are recorded. It should be completed from the approved configuration documents before handover.
Plan care and storage for your project
Build the plan from the furniture schedule
Give each furniture item or group a zone and asset reference. Attach the approved frame, finish, weave, fabric and cushion codes plus the relevant supplier instructions. Separate routine care from rain response, severe-weather action, seasonal closure and repair. The project team should set frequencies after considering actual exposure, use and manufacturer guidance.
| Record | What it should contain | Who must be assigned |
|---|---|---|
| Routine clean | Surfaces, method, approved products, prohibited tools, drying and safe return to service. | Operations team and supervisor responsible for checking completion. |
| Inspection | Loose fixings, finish damage, weave or cord damage, unstable feet, moving parts, seams, closures and cushion condition. | Named staff member and escalation contact. |
| Rain or wet event | What is moved, opened, drained or dried; route; temporary location; and criteria for return. | Shift or facilities team available when the event occurs. |
| Severe weather | Trigger, authority, placement or storage procedure and any engineering or site requirements. | Site management; supplier instructions do not replace the project’s safety plan. |
| Seasonal closure | Cleaning, drying, dismantling if approved, protective measures, storage position and reopening inspection. | Facilities lead and storage-area owner. |
| Repair or replacement | Damage record, photos, part code, isolation from use, approval route and order information. | Person authorised to remove an item from service and contact the supplier. |


Size storage from the real handling sequence
- Inventory: list cushions, covers, small tables, stackable items, umbrellas or approved removable parts by zone and quantity.
- Internal space: allow the supplier’s required orientation and avoid compressing, folding or stacking parts in an unapproved way.
- Drying: separate a wet-item holding and drying route from clean dry storage; do not assume a closed cabinet can receive damp cushions.
- Access: check doors, lifts, steps, slopes, staff carrying distance and whether furniture blocks guest or emergency circulation during movement.
- Environment: confirm ventilation, drainage, cleanliness, pest control and contact with floors or walls.
- Identification: label each item by zone, furniture reference and cushion position so sets return to the correct location.
Use material-specific cleaning instructions
Compile instructions for each approved frame, finish, wood, rope, synthetic rattan, fabric and cushion build-up. If instructions conflict or omit a site condition, resolve the question before handover. Record the exact cleaner, dilution or method only when it comes from an applicable approved instruction; a generic online tip should not become the project’s procedure.
Prepare the handover pack
- as-built furniture schedule with zone, item, material and finish references;
- supplier care instructions and any project-specific clarifications;
- approved cleaners and prohibited products or methods;
- storage map, movement route and severe-weather responsibility;
- inspection checklist and damage-report contact;
- replaceable-part, fabric, cushion and hardware references;
- sample or control reference retained for later comparison.
Inputs needed to plan care before ordering
Share the zone plan, furniture schedule, opening pattern, staffing, cleaning practice, storage dimensions, weather-event procedure, destination and expected seasonal closure. State which parts must be replaceable and whether later phases need to match. GEORGE can review these project inputs with a proposed configuration, but the actual instructions, parts and service scope must be confirmed in the quotation and applicable project documents.
Return to Outdoor Furniture Materials for Projects for system selection, or use the fabric and cushion checklist for removable soft parts.