Identity and project responsibility
GEORGE Outdoor is the outdoor-project entry within George Group China, also presented publicly as GEORGE Group. It supports project discussions under the group’s confirmed business identity while the actual production, supply and service responsibility is defined for each quoted configuration.

Confirmed business identity
Who the buyer is contacting
- Public brand
- George Group China / GEORGE Group
- Standard foreign-trade name
- GEORGE BUILDING MATERIALS
- Legal company
- Foshan Jingcheng Zhizao Building Materials Co., Ltd. (佛山市敬城智造建材有限公司)
- Address
- No.44, 2nd Floor, Building 24, Yimeijia Sanitary & Ceramic World, Jihua 4th Road, Chancheng District, Foshan City, Guangdong Province, P.R.China
- Outdoor project contact
- Barry Liu, [email protected], +86 18566012949
How the supply network is described
The group uses more than one production route
The confirmed group network includes owned factories, equity-partner factories and commissioned production. Each proposal should identify the production route and quality-control evidence that apply to the selected outdoor categories.
For each proposed item, the project record should identify the exact product or configuration, who is responsible for production and supply, which sample and documents apply, and which services are included.
Outdoor-project role
What GEORGE Outdoor can coordinate with the buyer
Brief development
Translate area plans, use patterns, approximate quantities, exposure and operating requirements into a zone-based furniture brief.
Configuration discussion
Review relevant furniture categories, dimensions, materials, finishes, soft goods and samples, subject to confirmation for the quoted configuration.
Project documentation
Identify the drawings, samples, applicable evidence, packaging, destination and approvals needed to compare and authorize a proposal.
Supply interfaces
Clarify what is included or excluded around transport, installation, handover and adjacent work. On-site installation can be discussed and is charged separately.
Global inquiry
Projects may be discussed worldwide, with Europe, the Middle East, East Asia and the Americas as priority regions. Delivery and installation routes vary by destination.
Evidence boundaries
Group-level certificates may be introduced, while the relevant product, version, configuration and destination requirements must be checked for the actual project.
A shared project record
Plans connect the furniture package to other responsibilities

A useful project record names the decision owner for building structure, waterproofing, drainage, landscaping, shade, kitchens, bars, lighting, fire features and local compliance. Record how each interface affects furniture size, location, movement or fixing, and assign its design, supply, installation and approval responsibility.
Before approval
Ask these questions against the exact proposal
- Which legal and commercial entity appears on the quote and project documents?
- Who is responsible for production, supply, inspection and project communication for each item?
- Which drawing, finish sample, fabric sample and approval record controls production?
- Which certificate or test report applies to the proposed product, configuration and destination?
- What do packaging, transport, installation, handover and replacement discussions include or exclude?
Continue with the project specification checklist, review how evidence should be tied to the offered configuration, or map responsibilities through delivery and handover.
Confirm the responsible party
Put identity, configuration and scope questions into the project brief
Share the destination, project stage, area schedule and the evidence your team needs. GEORGE Outdoor can identify the points that require confirmation before a proposal is treated as project-specific.